Step 1 : THE DESIGN
The beginning of the project consists in identifying your needs, your wishes, and the possibilities that your house and site offer.
After the initial consultation, the first designs will be drafted, in order to define the concept that suits your request.
Finally, you will decide which design suits your requirements and detailed drawings are produced.
Step 2 : THE MANUFACTURE
Once the concept is chosen, we order all the quality material needed to manufacture your project in our workshop.
We will make the building available to be viewed once completed in our factory prior to delivery to site. This is to ensure you are happy with the product and that in the unlikely event that there were to be variations, these can be considered prior to site delivery.  
Step 3 : THE ON-SITE INSTALLATION
The installation of the build will be really fast. Our crew will arrive to do all site preparation in advance. This may include the removal of existing paths to rear of house, re-routing of drainage and opening up the back of the house (for extension). There will be a crane on site for one day. First of all, solid precast concrete foundations will be set, then the extension/rooms will be lifted into position. If we are not off site within ten days we will pay you rent for every additional day we spend on site*.